Project Engineer for this new data center, lab space, and office. This project included:
- Two 35kV services
- Two 2500kVA pad-mounted transformers
- Two 2250kW/2800kVA, 480V diesel generators
- Main-Generator-Tie-Generator-Main bus-arrangement with closed-transition auto-transfer and redundant PLC control
- Three 750kVA UPS systems, N+1
- (12) 225kVA PDUs
- 450 tons of DX precision cooling, N+1
- Independent DC systems for disaster recovery
- 20,000 SF of raised floor space
- 67,000 Class A office space
- Coordination, short-circuit, and arc flash study
- Integrated testing, commissioning services