Project Engineer for feasibility study for new main substation to support pharmaceutical campus expansion. This project included:
- 69kV-12.47kV substation layout
- Two 43MVA transformers with load-tap changers.
- Double-ended 15kV switchgear in PDC.
- 12.47kV site distribution feeding over 20 buildings.
- Future 5MW co-generation plant.
- Options for indoor 138kV Gas-Insulated Switchgear (GIS) and outdoor 138kV with ring bus configuration.