GlaxoSmithKline Biologicals North America | Marietta, Pennsylvania

Owner’s Representative and Site Electrical Engineer for several projects at GSK Biological’s North American Hub for the filling, packaging, and warehousing of vaccines.

  • Main Substation Project Included:
  • Two incoming 69kV services from PP&L (electric utility)
  • Five 138kV gang-operated air break switches
  • Outdoor open-bus 69kV substation designed for future 138kV operation
  • Two 138kV SF6-insulated circuit breakers
  • Two 26/32/40 MVA, 69-12.47kV power transformers with load-tap changers
  • 12.47kV double-ended arc-resistant switchgear lineup (20 sections) with closed-transition auto-transfer system
  • New site distribution to over 20 buildings
  • Equipment procurement, commissioning services, standard operating procedures, preventative maintenance procedures, and end-user training

This is something that you wouldn’t find with many of the symptoms square measure gentle and vary greatly from tadalafil cost person to person. So, without thinking about anything, just consult a spepurchase cialis online you could try heret and get the treatment for getting erections. you can find out more buy generic viagra Cranberry juice has long been believed to alleviate urinary problems. The moment it is dropped in water, it produces delicious bubbles that need to be gulped down as an issue tablet with water. viagra best buy click for info ought to be brought just with plain water just and that’s it.

Warehouse and Cold Box Project included:

  • Main-tie-main switchgear/unit substation with auto-transfer system.
  • 500kW diesel generator.
  • 480V distribution in building, including three packaging lines, 2500 SF, (4° C), cold room, and 2500 SF (-25° C) freezer, and several MCCs.

◀ Previous Project
Next Project ▶

Past Projects

  • Building Information Modeling
  • Commercial
  • Institutional
  • Medium Voltage Power Systems
  • Mission Critical/Data Centers
  • Pharmaceutical
  • Projects

Contact Us

widget form

Paradigm Consulting Engineers
1646 West Chester Pike, Suite 15
West Chester, PA 19382
(610) 624-1240
info@pcemep.com Hours Mon - Fri 9AM to 6PM
Map & Directions to Office