HCL Data Center, Parsippany, New Jersey
Project Engineer for new data center. This project included:
- 3,500 SF raised floor space
 

Project Engineer for new electrical service for 290,000 SF, 16-story high rise in center city Wilmington. This project included:                                                                                                                                                  Two 15kV electric services.                                                           Main-tie-main 15kV switchgear lineup with auto-transfer capability.                                                           1500kVA pad-mounted transformer.                                                           3000A low-voltage switchgear for building service/distribution.                                                           Coordination, short-circuit, and arc flash study.                                                           Component testing, integrated testing, commissioning services.
 

Project Engineer for the 13.2kV electrical distribution and emergency generation for this new 120-acre campus with 350,000 SF of institutional space. This project included:                                                                                                  Six electric manholes with separable connectors, junctions, and fusing.                                                           Five 1500kVA pad-mounted transformers.                                                           Two 500kVA submersible transformers.                                                           Three 400kW diesel generators.                           
 

Project Engineer for construction of transformer vault/switchgear building, and interconnection with utility company. This project included:                                                                                                  Three 27kV electric services (one aerial and two underground, approximately 3,000 feet each.                                                           Three 2000kVA network transformers.                                                           Three 4000A network protectors.                                                           4000A – 480/277V switchgear; main-tie-main-tie-main.                                                           De-commissioning of 7MW prime-power diesel generator                           
 