- Retrofit of existing Main-tie-main switchgear/unit substation.
- Main-generator-tie-generator-main switchgear/unit substation with auto-transfer system, and closed-transition generator synchronizing, paralleling, and load control system..
- 480V distribution in building, including five 25000 SF (4° C) cold rooms, which store the majority of the site’s product.
- Component testing, integrated testing, commissioning services.
SOP/Training Project included:
- Creation of Standard Operating Procedures (SOPs) for all site substations.
- End-User training for onsite engineering/operations/maintenance staff.
Site-Wide Power System Study Project included:
Coordination, short-circuit, and arc flash study for entire campus.
Over 4,000 electrical system components.